Ongoing Projects

Emet Boric Acid Reaction and Filtration Units

Construction of Boric Acid Reaction and Filtration Unit 200.000 t/year

  • Processing Design,
  • Procurement, Assembling and Commissioning of All Process Equipments,
  • Design and Construction of Monolithic Dome with a storage capacity of 5.0000 tons of Colemanite,
  • Design and Production of Acid Resistant Tanks in different tonnages with a total capacity of 4.000 m³,
  • Design and Production of Solution and Acid Resistant Tank Mixing Systems,
  • Construction of Facility Building,
  • Design & Commissioning of Electrical and Automatization Systems,
  • Design and Connecting of Chemical Process Pipeline,
  • Construction of Mechanical Installation,
General Directorate of Eti Mine
27.02.2023 - 17.08.2025