Scope of 56.000.000 Sm³/d capacity of Saros FSRU Terminal and Pipeline Construction;
- Construction of transportation bridges with a length of 90 meters,
- Construction of Reclining, Mooring, Loading-Unloading, Service Dolphins,
- Construction of Tugboat Dock and Breakwater,
- Construction of Bored Piled Breakwater, 6.000 m. Ø 120 cm - 3.000 m. Ø 60 cm
- Jet Grout, 42.500 mt. Ø 80cm
- 2.800 m, D: 1524 T:24 mm - 1.200 m, D: 1422,4 T: 22 mm Steel Piles
- Dredging, 49.500 m³
- Construction of Control Building and Workshops,
- Procurement & Commissioning for all equipment,
- Construction and connection of natural gas pipeline, 17.175 m. / 36“
- Procurement & Commissioning of Loading arms are 2X12” with 28.000.000 Sm³/d. per arm capacity,
- Procurement & Commissioning of 100t. capacity Quick Release Hooks,
- Construction of 2 pieces Pig Station,
- Construction of access roads,
- Designing of all projects (Construction, Mechanical & Electrical),